Project Address: Level 1, 3 Ryder Boulevarde, Rhodes, NSW
Project Size: 400 sq.m
Contract Value: $150K
Construction Period: 3 Weeks
Architect: Custance Associates

Project Summary:

Project Summary: Partial Office fit out/refurbishment, due to Home Loan Experts moving out of their existing office that CIP built 4 years ago. The works comprised of modifications to existing workstations, all rewired with Cat 6 data and soft wiring, in addition to acoustic wall panelling, wall graphics, reception joinery, floor finishes, AV and loose furniture. Wall graphics are the key feature of the fit out creating creative spaces and ambiance representing what HLE were looking for.


Fisher & Paykel

Fisher Paykel
Fisher Paykel Cip 6
Fisher Paykel Cip 5
Fisher Paykel Cip 4
Fisher Paykel Cip 3
Fisher Paykel Cip 2
Fisher Paykel Cip 7
Fisher Paykel Cip 8

Client: Fisher & Paykel
Sector: 
Corporate Head Office, Sydney
Project Address: 1 Eden Park Drive, Macquarie Park
Project Size: 1,200 sq.m
Contract Value: $1.25 Million
Construction Period: 8 Weeks
Architect: Custance Associates

Project Summary:

Corporate Interior Projects were nominated for this prestige project by an award winning New Zealand Architect, Custance NZ due to time constraints on the project as well as intricate design. Corporate Interior Project were flown to NZ to inspect Fisher and Paykel’s head office in Aukland to get a feel for what was required in the Australian head office in Macquarie Park, Sydney. The original project construction program was allocated for 12 weeks due to the intricate detail of the design and long lead times on certain material that was to be used. 2 weeks into the construction program we were informed of a mix up on the lease of Fisher and Paykel’s current accommodation. We were asked to expedite the program to be finished in 9 weeks, which left us 7 weeks to complete the works. CIP in conjunction with their sub-contractors pulled out all the stops to ensure this would happen. This project was nominated for an award in the NZ.

Curved Ply Grid Ceiling

The curved timber ply ceiling was the main feature of the entire project. The ply had to be flown in from NZ and had to be computer generated prior to manufacturing. It was manufactured in pods to ensure transport and access to building. It was erected like a jigsaw puzzle of approx. 75 pieces. The finished product appeared as one piece, one ceiling.


University of Tasmania (UTAS)

University of Tasmania
University of Tasmania
University of Tasmania
University of Tasmania
University of Tasmania
University of Tasmania
University of Tasmania
University of Tasmania

Client: University of Tasmania (UTAS)
Sector: 
Educational Facility
Project Size: Refurbishment of two existing buildings
Address: Lilyfield, Callan Park
Contract Value: $2.36 Million
Construction Period: 22 Weeks
Architect: ARTAS Architects

Project Summary:

The University of Tasmania at Callum Park was a challenging project due to its heritage listing. The project was carried out while students were accessing the facility. The project was done in four stages encompassing all internal fit out refurbishments inclusive of offices, bathrooms, ceilings, floor coverings and an upgrade of all service trades to meet current regulations and Australian standards as well as external remedy works to the facade without comprising the heritage aspects of the building.


Hollis Consulting

Liverpool
Liverpool
Liverpool
Liverpool
Liverpool
Liverpool
Liverpool
Liverpool

Client: Hollis Consulting
Sector: Health 
Address: 171 Bigge Street, Liverpool
Project Size: 220 sq. m
Contract Value: $350K
Construction Period: 6 weeks
Architect: Paul Fiegel and Associates


Mitsubishi

Mitsubishi
Mitsubishi
Mitsubishi
Mitsubishi
Mitsubishi
Mitsubishi
Mitsubishi
Mitsubishi

Client: Mitsubishi
Sector: 
Corporate
Project Address: 50 Bridge Street, Sydney
Project Size: 600 sq.m
Contract Value: 
$250k
Construction Period: 4 Weeks
Architect: Urbanscope (Australia)


CIP Head Office

CIP Head Office
CIP Head Office
CIP Head Office

Client: CIP Head Office
Sector: 
Head Office

Address: 146/243 Pyrmont Street, Pyrmont
Architect: Nordan Jago

1800 YES CIP

CORPORATE INTERIOR PROJECTS

Find Us

CORPORATE INTERIOR PROJECTS
146/243 PYRMONT STREET,
PYRMONT, NSW 2009
T: 1800 YES CIP

  
Call Now