Customer Information Centre  – Transport for NSW

Transport NSW - Customer Information Centre
Transport NSW - Customer Information Centre
Transport NSW - Customer Information Centre
Transport NSW - Customer Information Centre
Transport NSW - Customer Information Centre
Transport NSW - Customer Information Centre
Transport NSW - Customer Information Centre
Transport NSW - Customer Information Centre

Client: Customer Information Centre  – Transport for NSW
Sector: 
Government
Project Size: 130 sq.m
Address: 243 Beamish Street, Campsie
Contract Value: $400k
Construction Period: 8 Weeks
Architect: Alicia Doyle Design

Project Summary:

Project Summary: Customer Information Centre for Metro is built to meet Transport and Metro standards. The main features of this project are the 1/21 compliant accessible ramps and the metro graphics. This was a complete fit out including construction of new retail shop front, floor work including full reconstruction of shopfront floor to include compliant ramp entry, steel supporting beams and posts, glazing, partitions, ceiling, floor coverings, kitchen, accessible bathroom, auto doors, security, av, power, data and custom joinery.  The Detailed project  was completed in 8 weeks. Behind the scenes; the project timing was pushed out when a non-compliant fire rated ceiling was discovered, CIP had to demo the existing non-compliant ceiling and replace it with two layer fire rated ceiling for compliance.


Department of Education – Mascot

Mascot
Mascot
Mascot
Mascot
Mascot
Mascot
Mascot
Mascot

Client: Department of Education
Sector: 
Government
Project Size: 900 sq.m
Address: Mascot, NSW
Contract Value: $1.5 M
Construction Period: 5 Weeks
Architect: IA Group

Project Summary:

This project included a priceless Aboriginal Glass artwork masterpiece to be moved from the original location to the new office in Mascot. CIP carefully managed this sensitive component of the project with kid gloves. Where some movers declined the job, CIP delivered the artwork successfully and hung it superbly in Reception. Other components of the project included ceilings, floor coverings, feature joinery, break out area, board room and meeting rooms, data and electrical, hydraulics workstations and loose furniture.


Transport for NSW – Level 27, 477 Pitt Street Sydney, Stages 1 & 2

Fisher Paykel
Fisher Paykel
Fisher Paykel
Fisher Paykel
Fisher Paykel
Fisher Paykel
Fisher Paykel
Fisher Paykel

Client: Transport for NSW
Sector: 
Government
Project Size: 1,750 sq.m
Address: Level 27, 447 Pitt Street, Sydney
Contract Value: $1.5M
Construction Period: 5 Weeks + 4 weeks
Architect: Alicia Doyle Interior Design

Project Summary:

Stages 1 and 2 were very involved and works included feature ceilings, pinnable wall fabrics, magnetic white boards – made to measure, lockers, feature carpet and vinyl throughout, a fully functional break out area with stone benchtops. It included an accessible bathroom, joinery items, all work stations and loose furniture. All services trades, fire, mechanical, hydraulics and electrical and data were all upgraded or modified to suit the new office environment.


Aboriginal Housing – Family & Community Services (FACS)

FACS
FACS
FACS
FACS
FACS
FACS
FACS
2.facs Cip

Client: Family and Community Services
Sector: Government 
Address: Parramatta
Project Size: 1,100 sq.m
Contract Value: $750K
Construction Period: 7 weeks
Architect: Nordon Jago Architects

Project Summary:

CIP successfully completed the FACS George Street project in 7 weeks. Works included 1,100M2 of office refurbishments consisting of partitions and services, electrical, mechanical, data and hydraulics.


Family & Community Services (FACS) – Charlestown

FAC
FAC
FAC
FAC
FAC
FAC
FAC
FAC

Client: Family & Community Services (FACS) – Charlestown
Sector: 
Government
Project Address: 309 Charlestown Road, Charlestown
Project Size: 600 sq.m
Contract Value: 
$450k
Construction Period: 5 Weeks
Architect: GHD Newcastle

Project Summary:

FACS Charlestown was executed and completed over the Christmas period. The works included extensive demolition works of walls and floor coverings, strip out of all redundant services. Construction of doors and walls, floor finishes and resilient floor finishes, customer service areas comprising of custom joinery, wall finishes, wall panelling and pinboards. Installation of services, mechanical, hydraulic, security, fire services, FACS specially developed data requirements and coordination of all work stations and loose furniture.


Education – George Street, Sydney

Fisher Paykel Cip 7
Fisher Paykel
Fisher Paykel Cip 6
Fisher Paykel Cip 5
Fisher Paykel Cip 4
Fisher Paykel Cip 3
Fisher Paykel Cip 2
Fisher Paykel Cip 8

Client: Education
Sector: Office space
Address: 272 George Street, Sydney
Project Size: 750 sq.m
Contract Value: $560K
Construction Period: 8 weeks
Architect: Custance

Project Summary:

This project included extensive demolition works of structural walls that required steel beams and posts to ensure no deflection in the slab above. Scope of works were inclusive to new ceilings and floor coverings throughout, work stations, loose furniture, feature joinery, a fully functioning breakout area, meeting rooms, quiet rooms.


Department of Education – Dehli Road, North Ryde

Dehli Road
Dehli Road
Dehli Road
Dehli Road
Dehli Road
Dehli Road
Dehli Road
Dehli Road

Client: Department of Education – Dehli Road, North Ryde
Sector: Office Fit Out 
Address: 39 Dehli Road, North Ryde
Project Size: 230 sq.m
Contract Value: $275K
Construction Period: 5 weeks
Architect: Custance

Project Summary:

CIP fit out this project over a 5 week period reaching practical completion. This project was fit out with an extensive communications room which was a large call centre. It included fixed joinery, loose furniture and workstations, resilient flooring and feature carpet, acoustic wall panelling, audio visual, graphic and a feature wall.


Family and Community Services – JIRT

JIRT Wollongong
JIRT Wollongong
JIRT Wollongong
JIRT Wollongong
JIRT Wollongong
JIRT Wollongong
JIRT Wollongong
JIRT Wollongong

Client: JIRT Wollongong
Sector: Government 
Address: 25 Atchinson Street, Wollongong
Project Size: 700 sq.m
Contract Value: $500K
Construction Period: 6 weeks
Architect: Custance Associates (Australia)

Project Summary:

JIRT project consisted of workstations loose furniture, joinery, security, audio visual, floor coverings, ceilings. Completed in 6 weeks.


Department of Education – Primary Schools Infrastructure, Quakers Hill

Quakers Road
Quakers Road
Quakers Road
Quakers Road
Quakers Road
Quakers Road
Quakers Road

Client: Education
Sector: School infrastructure office space
Address: Colebee Street, Nirimba
Project Size: 800 sq.m
Contract Value: $600K
Construction Period: 8 weeks
Architect: Property Beyond

Project Summary:

This project included extensive demolition works of structural walls that required steel beams and posts to ensure no deflection in the slab above. Scope of works were inclusive to new ceilings and floor coverings throughout, work stations, loose furniture, fixed joinery, a fully functioning breakout area and new accessible bathrooms. Extensive client directed variation work to the ground floor and level 2 which were not in the original scope and CIP were able to keep to the original program.